Subcontractor Markup: What to Charge as a General Contractor
Say a general contractor hires an electrician for $14,000 on a kitchen remodel, then bills the client exactly $14,000 for that line. On paper that looks fair. In practice, the GC just spent two weeks scheduling the trade around three other crews, pulled the permit, carried the insurance certificate, and fielded the callback when a breaker tripped three months later — all for free.
Subcontractor markup is the percentage a GC adds on top of what a sub bills, and it's how that coordination actually gets paid for. The standard range runs 10% to 20%, with riskier or more hands-on trades landing near the top and subs you've vetted for years sitting closer to the bottom. Skip it, and you're running a project management business without charging for project management.
This line item gets skipped more than almost any other in a GC's pricing, usually out of guilt. Here's where the number actually comes from, how it moves by trade, and a worked example you can check your own pricing against.
What subcontractor markup actually pays for
Markup on a sub bid isn't profit bolted onto someone else's price. It covers four things the sub isn't doing: scheduling the trade around every other crew on the job, holding the insurance and licensing risk if something goes wrong, carrying the warranty call after the sub has already moved on to their next project, and floating the payment — plenty of GCs pay the sub well before the client's final draw clears.
If you haven't built a real number for your own overhead rate, start there before you touch subcontractor markup. Marking up a sub without knowing what your own overhead costs is a guess stacked on top of a guess, and it's how GCs end up with a healthy-looking revenue number and a thin bank account.
The typical range by trade
There's no single correct percentage, because the risk you're absorbing isn't the same for every trade.
| Sub trade | Typical GC markup | Why |
|---|---|---|
| Electrical, plumbing, HVAC | 15%–20% | Licensed trades, high callback risk, code exposure |
| Framing, drywall, insulation | 10%–15% | Labor-heavy, lower liability, usually a known sub |
| Specialty (structural engineer, elevator, pool) | 10% or a flat fee | Dollar amounts get large fast; a flat percentage can overshoot |
| A new or unvetted sub | 20%+ | You're pricing in the risk of a bad bid or rework |
Those ranges hold for residential remodel and new-construction work. Commercial GCs often run lower — 5% to 10% — because contract values are bigger and owners expect tighter overhead-and-profit lines. Bid commercial work at residential markup percentages and you'll lose before anyone even discusses schedule.
Markup vs. margin — know which one you're quoting
These two words get used interchangeably and they shouldn't be. Markup is what you add on top of the sub's cost. Margin is what fraction of the final price is actually profit. They're different math, and the gap between them is where a lot of GCs quietly underprice without noticing.
Take an $18,000 electrical sub bid marked up 15%. The client sees $20,700. That $2,700 difference feels like a 15% win, but as a share of the final $20,700 price, it's only about 13% margin. If you were aiming for a 15% margin and used markup math instead, you left real money on the table. Our breakdown of markup vs. margin has the full conversion table if you want to check your own numbers.
A worked example
Here's that same $18,000 electrical bid, start to finish:
- The sub's bid comes in at $18,000 for the electrical scope.
- You apply a 15% markup to cover scheduling, licensing exposure, and warranty: $18,000 × 1.15 = $20,700.
- That $20,700 becomes a single electrical line on the client-facing quote, not two separate lines.
- Your actual margin on that line is $2,700 ÷ $20,700 — about 13%, not the 15% you might expect.
- If the client calls six months later about a tripped breaker, that margin is what pays for the hour you'll spend coordinating the warranty visit.
Skip the markup on that same $18,000 bid and you've effectively donated your scheduling time, your insurance exposure, and that future warranty call to the client. Most GCs who say they "don't believe in" marking up subs haven't actually run this math.
Should the client see the markup broken out?
Almost never, and most GCs who try it regret it. Showing "Electrical sub bid: $18,000" next to "GC markup: $2,700" invites a conversation that doesn't need to happen. The client calls their contractor cousin, finds out electricians bill less direct, and now you're negotiating a number that was never meant to be itemized in the first place.
Bundle the marked-up number into the trade line itself, the same way you'd price any other scope item. Our guide on what belongs in a contractor quote covers how to keep line items clear without exposing the cost structure underneath them.
Mistakes that quietly kill margin on subs
- Not marking up at all, out of a feeling that it's somehow dishonest to the client. It isn't — see above.
- Marking up a bid you never actually vetted. A cheap, unvetted sub who causes a callback or a scheduling blowup costs more than the markup ever covers.
- Double-dipping on materials the sub already marked up themselves, instead of marking up their total bid once.
- Forgetting markup on change orders that run through a sub. If the original electrical scope got a 15% markup, the $1,400 add for an extra circuit needs the same treatment, not a flat pass-through.
Subcontractor markup: quick answers
How much should a general contractor mark up subcontractors?
Most GCs land between 10% and 20% over the subcontractor's bid. Licensed trades with higher liability exposure, like electrical and plumbing, tend toward the top of that range. Labor-heavy trades you've worked with for years, like framing or insulation, can run closer to 10%. A new or unvetted sub justifies a markup at the high end, since you're absorbing more risk of rework.
Is it dishonest to mark up a subcontractor's bid?
No. The markup pays for the coordination, scheduling, insurance exposure, and warranty responsibility you're taking on as the GC of record — work the sub isn't doing and isn't getting paid for. It's only a problem if you're marking up a bid you never vetted, or marking up materials the sub already marked up on their own price.
Should subcontractor markup show up as its own line item on the quote?
Usually not. Most GCs bundle the marked-up number into the trade line itself, something like "Electrical: $20,700," instead of splitting it into the sub's bid plus a separate markup line. Breaking it out just invites the client to negotiate a number that was never meant to be itemized.
Does subcontractor markup change by trade?
Yes. Electrical, plumbing, and HVAC subs usually get marked up 15% to 20% because of licensing exposure and callback risk. Framing, drywall, and insulation subs tend to run 10% to 15%. Highly specialized subs, like structural engineers or elevator installers, are sometimes marked up as a flat fee instead of a percentage, since the dollar amounts get large fast.
What's the difference between markup and margin on a subcontractor bid?
Markup is the percentage you add on top of the sub's cost. Margin is the percentage of the final client price that's actual profit. An $18,000 sub bid marked up 15% comes out to $20,700 — but that $2,700 difference is only about 13% margin, not 15%. Quoting margin when you mean markup is how contractors end up underpriced without realizing it.
Can a GC mark up a subcontractor's materials, not just their labor?
Only once. If the subcontractor's bid already includes their own material markup, don't add a second markup on top of the same materials — that's the double-dip that erodes trust when a client's electrician friend prices the same panel for less. Mark up the sub's total bid once, as a single number, and let your overhead rate cover the rest of your risk.
The bottom line
Subcontractor markup isn't an extra charge you're sneaking past the client. It's the fee for everything a GC does that a sub's invoice doesn't cover — scheduling, risk, warranty, and the cash flow gap between paying the sub and getting paid yourself. Land somewhere in the 10% to 20% range depending on the trade, know whether you're quoting markup or margin, and bundle it into the line item instead of breaking it out.
PRISM builds the full client-facing quote — sub lines, markup, and all — from a text or a voice note in a couple of minutes, so you're not doing this math by hand between job-site visits. Check the plans or try the live demo on the homepage, free.